English

Are you a construction contractor
or an architect?

Would you like to
cooperate with us?

Absence of thermal bridges

Thickness of the insulation layer is not all

Another important aspect is absence of thermal bridges. What are thermal bridges? They are simply fragments of the building envelope where thermal performance is much reduced in comparison to the neighbouring construction parts. The weakened thermal insulation can be linear (i.e. the gaps at the joints of insulation boards) or pointed...

Healthy climate

Our wellbeing is largely dependent on the number of air changes in the room, and consequently on suitable microclimate

Our wellbeing is largely dependent on the number of air changes in the room, and consequently on suitable microclimate: temperature, humidity and speed of the air flow. These parameters are related not to the construction technology, but rather to well designed ventilation, suitably selected heat source, construction of the building...

More floor space

When you use the Izodom technology to build a passive or low-energy house you get extra floor space.

How come? Thanks to excellent insulating properties, the walls do not need to be that thick. Super King Blok King Blok Standard Heat transfer coefficient 0,1 W/m2K 0,15 W/m2K 0,28 W/m2K Thermal resistance 10 m2K/W 6,66 m2K/W 3,57 m2K/W Total element thickness ...

Rules of construction

How do we build with the Izodom technology?

The Izodom technology, also called the lost formwork technology, is based on erecting concrete or reinforced concrete structures directly on site. Instead of traditional formwork made of planks or prefabricated modules used to shape the walls, the forms of a very hard insulation material are used. These forms are dry-stacked to make...

Foundation walls and basements

Foundation walls and strip footing are currently the most popular foundation methods

But threes methods are not as fast and convenient as the ground slab. To make the strip footing, Izodom recommends the MCFU 1/50 elements. They have 5-cm insulating walls and a 40-cm space where you put the reinforcement and pour the concrete. The strip footing should be made on a layer of lean concrete and horizontal waterproofing...
1, 2, 3, 4, 5, 6, 7, 8